Construction phase event Jungle Gym structure (2013 - )
- From
- 2013
- Functions
- Secondary construction element
Summary
The Jungle Gym Structure building element includes:
- Level 1 - Erect Steel / Dec / Reo (include Temporary […]
- Level 2 - Erect Steel / Deck / Reo - Pour with L
- Level 3 - Erect Steel / Deck / Reo - Pour with L
- Level 4 - Erect Steel / Deck / Reo / Pour
- Connect & Tension Macalloy Hangers / Remove Temp
- Level 5 - Erect Steel / Deck / Reo / Pour
Skip to
Details
Events
- 13 December 2013 - 9 April 2014
- Scheduled timeframe
Related Entries
Timeline
2013 - Jungle Gym structure
2014 - Link bridge
2014 Atrium steel stair
2014 Hanging studio steel frame
2014 Y-stair structure
2014 - Internal cladding
2014 Finishes to atrium