Construction phase event Jungle Gym structure (2013 - )

From
2013
Functions
Secondary construction element

Summary

The Jungle Gym Structure building element includes:

  • Level 1 - Erect Steel / Dec / Reo (include Temporary […]
  • Level 2 - Erect Steel / Deck / Reo - Pour with L
  • Level 3 - Erect Steel / Deck / Reo - Pour with L
  • Level 4 - Erect Steel / Deck / Reo / Pour
  • Connect & Tension Macalloy Hangers / Remove Temp
  • Level 5 - Erect Steel / Deck / Reo / Pour

Details

Events

13 December 2013 - 9 April 2014
Scheduled timeframe

Related Entries

Timeline

 2013 - Jungle Gym structure
       2014 - Link bridge
             2014 Atrium steel stair
                   2014 Hanging studio steel frame
                         2014 Y-stair structure
                               2014 - Internal cladding
                                     2014 Finishes to atrium