Construction phase event Facade works (2014)
- From
- 2014
- To
- 2014
- Functions
- Main construction element
Summary
The facade works include works on ground floor, Levels 1 - 4, the hoist location, and the Joseph Reed facade works.
Skip to
Details
Events
- 20 March 2014 - 5 September 2014
- Scheduled timeframe
Related Entries
Timeline
2013 - Site establishment
2013 - Excavation, retention and foundation works
2013 - 2014 Main concrete structure
2014 Cantilever structure
2014 Roof works
2013 - 2014 Atrium works and specialised structures
2014 Lift and plant works
2014 Facade works
2014 - Services and finishes
2014 External works